01 May 2006

More work on the dam

A bit dark, but you can see the semi-loads of soil brought in Friday and Saturday. 4 or 5 more arrving today (Monday). Will cover the area by about 100mm.

A start to the jetty.
Two 100x100mm poles, with another two going half way up (holes already there), and two at the top. Total length will be about 6 metres, and 2 metres wide.