29 May 2006

Fruit trees and jetty


Four fruit trees planted - apple, nectarine, mandarine and orange.


John, from down the road, came on Saturday to rip the soil and mound it for the trees that will be planted next month. One more row around the property and two rows across about 1/3rd and 2/3rds down. He did the job in about an hour.

All the fill was spread last Tuesday by Len.
Remember to click on pic to get a bigger image.

15 May 2006

The jetty takes shape



23 semi-loads of fill ready to spread out.

01 May 2006

More work on the dam

A bit dark, but you can see the semi-loads of soil brought in Friday and Saturday. 4 or 5 more arrving today (Monday). Will cover the area by about 100mm.

A start to the jetty.
Two 100x100mm poles, with another two going half way up (holes already there), and two at the top. Total length will be about 6 metres, and 2 metres wide.