01 December 2006
01 October 2006
01 September 2006
22 August 2006
14 August 2006
After the rains
07 August 2006
24 July 2006
26 June 2006
07 June 2006
Fruit trees and driveway
Progress on jetty
29 May 2006
Fruit trees and jetty
15 May 2006
01 May 2006
More work on the dam
24 April 2006
20 April 2006
Digging the dam
6.45am - just light. Mounds of dirt from the new hole in the ground. It will be spread out by a bulldozer in a couple of weeks to a depth of 200mm, and then a 100m layer of sandy fill will go over the top of that.
Standing on the excavator. The hole is about 2m deep, and at this stage about 15 x 15 metres. The sides will be at 30 degrees, and the final size will be about 20 x 28 metres.Could not go much deeper than 2m because the water table is just below that, and it's very salty water.
17 April 2006
Subscribe to:
Posts (Atom)