skip to main
|
skip to sidebar
Baldivis
22 August 2006
25 mm of rain overnight
Water pooling at Phil and Janet's block.
Flooding at the front part of my block.
After much more rain
Saturday evening - the dam is full!
Last thursday - filling up.
Hired an excavator to dig holes etc. This is after two hours of cleaning to get the mud off.
14 August 2006
After the rains
Above: early Thursday morning.
Above: Sunday midday, with another 200mm in the dam. Update Monday morning: water level it up to the next rung on the ladder.
07 August 2006
Things are growing
New vegies (broccoli and red cabbage) to add to the onion, leek, silverbeet, rhubard & beetroot.
One of the new trees around the dam.
Dam filling up with water
Water depth is 300 to 400mm, before rain of Saturday night. (update: 8/8/06 - over 500mm deep)
The drains I dug out on Saturday.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2012
(10)
►
January
(10)
►
2010
(14)
►
October
(14)
►
2008
(6)
►
December
(2)
►
March
(1)
►
January
(3)
►
2007
(26)
►
October
(3)
►
August
(3)
►
July
(6)
►
May
(2)
►
April
(6)
►
March
(5)
►
January
(1)
▼
2006
(35)
►
December
(1)
►
October
(1)
►
September
(1)
▼
August
(5)
25 mm of rain overnight
After much more rain
After the rains
Things are growing
Dam filling up with water
►
July
(1)
►
June
(3)
►
May
(3)
►
April
(9)
►
February
(1)
►
January
(10)
►
2005
(20)
►
December
(4)
►
November
(5)
►
October
(7)
►
July
(2)
►
January
(2)
►
2004
(3)
►
December
(3)