26 June 2006

Painted jetty


Handrails complete, and first coat of paint on the jetty.

07 June 2006

Fruit trees and driveway

Six fruit trees: Granny Smith apple, Sundowner apple, nectarine, Imperial madarine, Valencia orange and Tahatian lime.

The driveway to the house has been dug out to hold old bricks and rocks from demolition sites; this will be a good base for the limestone.

Progress on jetty

The jetty is almost finished. About 2 metres wide, and 6 metres long. 2 metres from the bottom of the dam to the deck.

A ladder is going to go on the left, and railings have to be fitted.

Pole to support the outlet of the fountain, and measure the depth.