24 April 2006

Dam completed

Dam digging completed - just the dirt to spread out now.
(Click to view larger image)

20 April 2006

Digging the dam

6.45am - just light. Mounds of dirt from the new hole in the ground. It will be spread out by a bulldozer in a couple of weeks to a depth of 200mm, and then a 100m layer of sandy fill will go over the top of that.

Standing on the excavator. The hole is about 2m deep, and at this stage about 15 x 15 metres. The sides will be at 30 degrees, and the final size will be about 20 x 28 metres.
Could not go much deeper than 2m because the water table is just below that, and it's very salty water.

17 April 2006

Excavator

Rusty's excavator waiting to start on Tuesday Wednesday.

Point Peron lookout

WWII lookout

Bike

Views from Point Peron

A secluded cove.

The peninsula.


Canoes in Shoalwater.

Shoalwater

Paint on the pergola

11 April 2006

Update on trees






The trees are doing much better now.

03 April 2006

Visitors





A flock of 25 geese came visiting from a palce about 1km away.

New construction




Built on Friday and Saturday, with the help of Ron.